
The Fisher family has served and is continuing to serve in all of our nations military and homeland security branches of service three generations strong.
1601 Austin, Texas
BIM is all about Building Information, with graphics to support and provide product information that is used in the building construction. BIM to FM projects should be set up with the “end in user mind”, meaning FM, Facility Management, must define what data, should be captured during design, construction, and handover.
With my years of construction experience and my education in Drafting and Design using applications I am able to create something where there is nothing. The picture above is a project that we didn't have yet. The issue was the two power lines close to the property. The owner wanted to know how we where going to proceed with the power line so close if we where rewarded the project. The project was not in 3D so I quickly massed the building and garage to scale on top of a civil PDF with the power lines in place. I place the tower crane and a ring of max coverage and limited the swing to stay in the bound of the property. With the tower crane in place, I continued with the placing of the construction parking lot and the location of the concrete pump station where all the concrete would flow. The garage was a precast. We where awarded the project.
Bazaarvoice’s New HQ in Austin
Google Earth
Bazaarvoice’s New HQ in Austin Has a Whole Foods Inside
https://www.americaninno.com/austin/office-envy/inside-bazaarvoices-new-hq-in-north-austin-1/
The Cellars are luxury apartments in a 10 story building, extraordinary living spaces, concierge-curated services, event space and more.
The project was not in 3D in the beginning but was added or redrawn in Revit so it could be brought into clash detected in Navisworks, All the Mechanical, Electrical, and Plumbing (MEP) was drawn in Revit which is a drawing program the draws in 2D and can be viewed in 3D for better collaboration between trades. When collaborating in 3D issues of construction conflict appear, solved, and corrected in the documents before the build starts.
311 Bowie is a 36 story building built close to the Colorado rive in Austin, Texas. 311 Bowie features luxury apartments at the upper floors and lease space and parking on the lower floors. 311 Bowie was a Revit / BIM build project that was Clash Detected all through the building. The building structure was a every 7 day poured floor turnaround. Because of the clash coordination in the trades in 3D Navisworks pre-build, the project had very few issues during the build.
Cad printed to PDF
Revit on a PDF
Made in Revit
Made in Revit
ArcGis mapping with current Shape file convertible to Cad
Made in Revit
Rendering gives the client a picture of what there dreamers are to be.
Files coming soon.
Register for a free monthly give away. In the message box leave your name , complete mailing address, Phone number, shirt size and I will draw for a monthly give away.
Open today | 09:00 am – 05:00 pm |